Rainwater Harvesting: After doing a thorough site assessment, we presented the builder with a plan to make the existing rainwater harvesting solutions more effective. We proposed to use the existing chambers as pits with injection bores in them and create a huge conventional pit with an injection bore.
We also proposed a dedicated 50 cu. meter rainwater storage sump storage and reuse of rainwater.
The execution was carried out by the builder, as per our design.