Interventions executed on the site
A-The Runoff Water at the Entrance Road Flows Through The Cutoff Trenches And Enters The Proposed 4’ wide cement Recharge Pit (8’ deep) Near the existing bore.
B-The Runoff Water From The Road Flows Through The Cutoff Trenches And Enters The The proposed 4’ wide cement Recharge Pit (8’ deep)